Temporary Traffic Lane and Sidewalk Closure- Clinch Cresent

Feb 7th, 2019

Michael Smitherman

Temporary Traffic Lane and Sidewalk Closure- Clinch Cresent

Starting on Thursday, Feb. 7, 2019 at 7 a.m. and continuing for approximately three weeks, contractors will be performing work in the vicinity of Clinch Cres. To facilitate this work, one lane of Clinch Cres. north bound will be closed between Prince Phillip Dr. and Arctic Ave. for the time period noted above.

Please note, the Clinch Cres. sidewalk and the crosswalk across Arctic Ave. in this area will also be closed. Students and staff are directed to access Arctic Ave. via the University Centre and avoid this area entirely during the work. Please note that the Metrobus stop in this area will be closed for the time period noted above. To view the closed area please click here. 

Specific Information For The Work

Area(s): Clinch Cres. between Prince Phillip Dr. and Arctic Ave.

Contractor: Marco Group MUN

Contact: Michael Smitherman

Phone Number: 864-6946

Date Scheduled: beginning Feb. 7, 2019 and continuing for approximately 3 weeks Time: All Inclusive

Contact

Core Science Facility

230 Elizabeth Ave, St. John's, NL, CANADA, A1B 3X9

Postal Address: P.O. Box 4200, St. John's, NL, CANADA, A1C 5S7

Tel: (709) 864-8000